WISDOT USH 12 Beltline Freeway Traffic Management System

Community PORTFOLIO

WIDOT USH 12 Beltline Freeway Traffic Management System

Wisconsin DOT, Madison, WI

SPECIFICATIONS

LOCATION

Madison, WI

SIZE

--

CLIENT

Payne & Dolan

CONTRACT AMOUNT

$1.7MM

FEATURED

New Beltline Flex Lane

Photo Credit: WIDOT

WIDOT is creating a “flex lane” on the Madison Beltline (USH 12/18) to relieve congestion of commuter traffic in both directions between I90/39 and Whitney Way.  Our scope of work includes the installation of a Freeway Traffic Management System (FTMS). The FTMS consists of Lane Control Signs and 5 Digital Message Signs, which will direct traffic flow to utilize the flex lanes.

Verona Road Phase IV

Community PORTFOLIO

Verona Road Phase IV

Wisconsin DOT, Madison, WI

SPECIFICATIONS

LOCATION

Madison, WI

SIZE

--

CLIENT

Speedway Sand & Gravel

CONTRACT AMOUNT

$900,000

FEATURED

Installation of a Freeway Traffic Management System

Photo Credit: WISDOT

This is the fourth phase of work on Verona Road from County Highway PD to Raymond Road. The electrical scope of work includes updating traffic signals, new street lights, and installation of a freeway traffic management system.

University Avenue Reconstruction

Community PORTFOLIO

University Avenue Reconstruction

City of Madison, Madison, WI

SPECIFICATIONS

LOCATION

Madison, WI

SIZE

1.9 Miles

CLIENT

Parisi Construction Co., Inc.

CONTRACT AMOUNT

$1.6MM

FEATURED

Underground conduit installation

Photo Credit: WSJ

Westphal & Co., Inc. upgraded six intersections on a 1.9 mile stretch of University Avenue with new traffic signals and median street lighting. The improvements included installation of underground conduit, wire, pull boxes and concrete bases.

USH 14 & USH 51 Rock County

Community PORTFOLIO

USH 14 & USH 51 Rock County

State of Wisconsin, Janesville, WI

SPECIFICATIONS

LOCATION

Janesville, WI

SIZE

11 Miles

CLIENT

Rock Road Companies, Inc.

CONTRACT AMOUNT

$1.6MM

FEATURED

Intelligent traffic control systems

This Wisconsin DOT project was part of the I39/I90 Widening Project preparing alternate routes for heavier traffic volumes expected during the future interstate expansion project. Our scope of work included upgrading 14 major intersections with traffic signals, intelligent traffic control systems, and street lighting over an 11 mile stretch from USH 51 and USH 14.

Prairie Avenue/HWY G Rock County

Community PORTFOLIO

Prairie Avenue / HWY G Rock County

State of Wisconsin, Beloit, WI

SPECIFICATIONS

LOCATION

Beloit, WI

SIZE

--

CLIENT

Rock Road Construction

CONTRACT AMOUNT

$1.5MM

FEATURED

Three new signalized intersections

This Wisconsin DOT project was part of the I39/I90 Widening Project preparing alternate routes for heavier traffic volumes expected during the interstate expansion project. Our scope included the improvement and addition of street lighting and traffic signals to CTH G/Prairie Avenue between Beloit and Janesville, including three new signalized intersections and one mile of new decorative street lighting heading.

WISDOT Rock County Weigh-in-Motion System I39/I90

Community PORTFOLIO

WISDOT Rock County Weigh-in-Motion Station I39/I90

Wisconsin DOT, Dane County, WI

SPECIFICATIONS

LOCATION

Rock County, WI

SIZE

--

CLIENT

Rock Road Construction

CONTRACT AMOUNT

$1.9MM

FEATURED

New Intelligent Transportation Systems (ITS)

The scope of this project is an installation of a new intelligent transportation system (ITS) weigh-in motion system for the Wisconsin Department of Transportation on I39/I90 in Southern Rock County, WI.

WISDOT County Highway M Reconstruction

Community PORTFOLIO

WIDOT County Highway M Reconstruction

State of Wisconsin, Fitchburg, WI

SPECIFICATIONS

LOCATION

Fitchburg, WI

SIZE

--

CLIENT

Integrity Grading & Excavating, Inc.

CONTRACT AMOUNT

$2.5MM

FEATURED

Lighting for underpass at CTH PD

Photo Credit: Channel 3000

Installation of lighting and traffic signals for WIS DOT on County Highway M in Dane County. The construction included two major intersections; CTH. M and  CTH. PD, as well as, CTH. M and  Mid Town Rd. Westphal provided path lighting and lighting for an underpass at CTH. PD.

WISDOT Rock County IH 90/39 and IH 43 Interchange Reconfiguration

Community PORTFOLIO

WIDOT Rock County IH 90/39 and IH 43 Interchange Reconfiguration

Wisconsin DOT, Beloit, WI

SPECIFICATIONS

LOCATION

Beloit, WI

SIZE

--

CLIENT

I-39 Constructors, LLC.

ENGINEER

Oneida Engineering Solutions

CONTRACT AMOUNT

$2.3MM

FEATURED

New Intelligent Transportation Systems (ITS)

Photo Credit: Oneida Engineering Solutions

This $114 million project near the border of Wisconsin and Illinois is located at the interchange of three highways: Interstate-90/39, Interstate-43, and State Highway 81. Our scope includes the demolition of existing electrical systems and installing new traffic signals, lighting, and ITS (intelligent traffic systems). There is a robust coordination effort between trades on this project because of the number of new structures to be built.

WISDOT Dane County Weigh-in-Motion System I39/I90

Community PORTFOLIO

WISDOT Dane County Weigh-in-Motion System I39/I90

Wisconsin DOT, Dane County, WI

SPECIFICATIONS

LOCATION

Dane County, WI

SIZE

--

CLIENT

Mashuda Contractors

ENGINEER

Oneida Engineering Solutions

CONTRACT AMOUNT

$2.7MM

FEATURED

New Intelligent Transportation Systems (ITS)

Photo Credit: Oneida Engineering Solutions

The project is located on southbound I-39/90 in Dane County, WI.  The scope of our project is to upgrade the existing weigh-in motion/static scale system for large vehicles. We are also upgrading the lighting for the building (the Safety and Weight Enforcement Facility #16).  Along with the SWEF improvements we are installing new intelligent transportation systems (ITS) within the limits of the project.