![](https://media.westphalec.com/wp-content/uploads/2023/09/07114027/dane-law-enf-solar_3-500x500.jpg)
Community PORTFOLIO
WIDOT USH 12 Beltline Freeway Traffic Management System
Wisconsin DOT, Madison, WI
SPECIFICATIONS
LOCATION
Madison, WI
SIZE
--
CLIENT
Payne & Dolan
CONTRACT AMOUNT
$1.7MM
FEATURED
New Beltline Flex Lane
![Beltline-at-Fish-Hatch-Feb.-2021-676x420](https://media.westphalec.com/wp-content/uploads/2021/03/20060747/Beltline-at-Fish-Hatch-Feb.-2021-676x420-2.jpg)
Photo Credit: WIDOT
WIDOT created a “flex lane” on the Madison Beltline (USH 12/18) to relieve congestion of commuter traffic in both directions between I90/39 and Whitney Way. Our scope of work included the installation of a Freeway Traffic Management System (FTMS). The FTMS consists of Lane Control Signs and 5 Digital Message Signs, which will direct traffic flow to utilize the flex lanes.