Sun Prairie West High School Solar

SOLAR PORTFOLIO

Sun Prairie West High School Solar

Sun Prairie, WI

SPECIFICATIONS

LOCATION

Sun Prairie, WI

CLIENT

Sun Prairie School District

ARCHITECT

N/A

CONTRACT AMOUNT

$350,309

SIZE (MW DC)

N/A

The state of the art Sun Prairie West High School is truly a building of the future with a ballasted roof solar array. The racking system requires no mechanical attachments to the roof, which means minimal roof penetrations. 712 Heliene 400 watt solar modules cover two roof areas. Three SolarEdge inverters, located in the electrical room, feed solar generated energy directly into the schools electrical system.

Baraboo High School Solar

SOLAR PORTFOLIO

Baraboo high School Solar

Baraboo, WI

SPECIFICATIONS

LOCATION

Baraboo, WI

CLIENT

Baraboo School District

ARCHITECT

N/A

CONTRACT AMOUNT

$294,545

SIZE (MW DC)

140

A 140 kW ballasted solar array was completed at Baraboo High School in 2022. The solar array offsets electrical usage by the high school and provides real-time production information that shows students the value of renewable energy.

Madison West High School Solar

SOLAR PORTFOLIO

Madison West High School Solar

Madison, WI

SPECIFICATIONS

LOCATION

Madison, WI

CLIENT

Madison Metropolitan School District

ARCHITECT

N/A

CONTRACT AMOUNT

$179,059

KW SIZE

124. 32

Madison West removed two older systems – a solar electric and a solar hot water system – to make room for a new 124 kW ballasted solar array. Conduit installation was tricky and required routing through several maintenance closets to the electrical room.

Dane County Operations Center Solar

SOLAR PORTFOLIO

Dane County Operations Center Solar

Madison, WI

SPECIFICATIONS

LOCATION

Madison, WI

CLIENT

Dane County

ARCHITECT

N/A

CONTRACT AMOUNT

$70,944

Size (MW DC)

N/A

Dane County Operations uses solar power to supply maintenance and materials for Dane County lakes and parks. 98 solar panels are attached to the garage roof. Three SolarEdge 14.4 kW, 208 volt interters are mounted on a custom uni-strut rack built near the electrical switchgear. Westphal was selected as the installation contractor through an RFP process.

Dane County Law Enforcement Training Center Solar

SOLAR PORTFOLIO

Dane County Law Enforcement Training Center Solar

Windsor, WI

SPECIFICATIONS

LOCATION

Windsor, WI

CLIENT

Dane County

ARCHITECT

N/A

CONTRACT AMOUNT

$59,861

Size (MW DC)

N/A

84 Solar modules are attached to the standing seam roof of the Law Enforcement Training Center. Ironridge flush-mounted racking using S5! Standing seam attachment clips eliminate the need for any roof penetrations. Three SolarEdge HD Wave inverters convert solar generated DC electricity to usable AC power.

Jack Young Middle School Solar

SOLAR PORTFOLIO

Jack Young Middle School Solar

Baraboo, WI

SPECIFICATIONS

LOCATION

Baraboo, WI

CLIENT

Baraboo School District

ARCHITECT

N/A

CONTRACT AMOUNT

$216,175

Size (MW DC)

N/A

Westphal installed a ballasted roof array on the roof of Jack Young Middle School. 312 solar modules are supported by an Ecolibrium Ecofoot racking system. 3 SolarEdge 40 kW inverters are installed on a north-facing wall on the roof.

Monona Grove High School Solar

Monona grove solar project

SOLAR PORTFOLIO

Monona Grove High School Solar

Monona, WI

SPECIFICATIONS

LOCATION

Monona, WI

CLIENT

McKinstry Essention/Monona Grove School District

ARCHITECT

Westphal Design/Build

CONTRACT AMOUNT

$420,800

Size (MW DC)

676 kW

1,410 solar modules are installed on 6 different roof areas. Unirac ballasted racking supports the 480 watt modules. Slipsheets placed beneath each ballast tray protect the roof from abrasion. Rigid metal conduit delivers DC power to the nine Solectria 60 kW inverters and from the inverters to the school’s electrical service. The Monona Grove installation is the largest system installed on a K-12 public school in Wisconsin.